Finished open-plan floor with a breakout table and magenta chairs, planted screens and a glazed meeting pod with fluted privacy film, beneath a new suspended ceiling
All projectsWorkplace / Bristol

CIG Interiors / Project 08

Burges Salmon offices, Bristol

Acoustic partitions and linings across three floors of the Burges Salmon offices in Bristol.

View 5 photographs
Location
Bristol
Sector
Workplace (legal)
CIG package
Partitions / Linings / Acoustics
Programme
November 2025, 5 months

The project

Three floors.
Built to the acoustic spec.

CIG Interiors delivered the partitions and linings package for the refurbishment of three floors at the Burges Salmon offices in Bristol, working for the main contractor over a five-month programme from November 2025.

Fire-rated slab-to-slab partitions up to 3.5 m high, raised-floor-to-soffit demountable walls, staggered-stud acoustic walls to Rw 59 dB, independent linings and deflection heads were set out to the architect’s wall-type schedule, with technical submissions for every system before work started.

CIG scope

The package
behind the pictures.

  • Slab-to-slab and raised-floor-to-soffit acoustic partitions
  • Staggered-stud walls to Rw 59 dB between meeting rooms
  • Independent wall linings and deflection heads
  • Making good to retained partitions and ceilings
  • Three floors, sequenced to the main contractor’s programme

Planning something similar?

Bring us the brief.

Share your drawings, location and target programme with the Interiors team.

Discuss a similar package